Drilling rig model |
ARC-200 |
ARC-300 |
ARC-500 |
ARC-800 |
ARC-1200 |
|
Overall machine parameters |
Vehicle weight |
6T |
7.5T |
9.5T |
17T |
23T |
Shipping dimensions |
6000*1750*2350mm |
6750*2200*2550mm |
6750*2200*2650mm |
10500*2250*3300mm |
11500*2250*3400mm |
|
Chassis |
Engineering steel tracks Hydraulic walking chassis |
Engineering steel tracks Hydraulic walking chassis |
Engineering steel tracks Hydraulic walking chassis |
Engineering steel tracks Hydraulic walking chassis |
Engineering steel tracks Hydraulic walking chassis |
|
Track ground length |
2150mm |
2500mm |
2500mm |
7000mm |
8000mm |
|
Track chassis width |
1700mm |
1800mm |
1800mm |
2250mm |
2250mm |
|
Hydraulic high outriggers |
4 |
4 |
4 |
4 |
4 |
|
Machine power |
Yuchai four-cylinder diesel engine |
Yuchai six-cylinder diesel engine |
Cummins six-cylinder diesel engine |
Weichai six-cylinder diesel engine |
Weichai six-cylinder diesel engine |
|
Host power |
77.3kW |
110kW |
132kW |
176kW |
220kW |
|
Technical parameters |
Applicable rock strength |
F=6~20 |
F=6~20 |
F=6~20 |
F=6~20 |
F=6~20 |
Drill pipe diameter |
Φ89/Φ102 |
Φ89/Φ102/Φ114 |
Φ89/Φ102/Φ114 |
Φ102/Φ114/Φ127 |
Φ102/Φ127/Φ146 |
|
Drilling diameter |
95-254mm |
95-350mm |
95-350mm |
105-550mm |
105-800mm |
|
Drilling depth |
200m |
300m |
500m |
800m |
1200m |
|
Drill pipe length |
1.5/2/3m |
1.5/2/3m |
1.5/2/3m |
3/6m |
6m |
|
One-time advancement length |
3.6m |
4m |
4m |
6m |
6m |
|
Footage efficiency |
10-35m/h |
15-35m/h |
15-35m/h |
10-35m/h |
10-35m/h |
|
Rotary torque |
5300-7600N.m |
6200-8500N.m |
8500-12000N.m |
9000-18000N.m |
12000-24000N.m |
|
Power head lifting force |
15T |
22T |
22T |
47T |
57T |
|
Winch lifting force |
1T |
2T |
2T |
2.5T |
2.5T |
|
Climbing angle |
30° |
30° |
30° |
21° |
21° |
|
Walking speed |
2.5km/h |
2.5km/h |
2.5km/h |
5km/h |
6.4km/h |
Note: Products are constantly being improved. Any changes will not be notified separately. Please refer to the actual product.